  1. Egin zuloa zutoinetarako eta giltzetarako.

 

Dig the holes on the ground for the post at every 2m, or 2.5m, or 3m, or 5m , the common hole size is 300mm-500mm . depth is 500mm-1000mm. alignment keep them in the line. Every 5-20m , on the left and right of the post,  dig two holes for two braces. the hole size same as the post hole size.   

 

security concertina razor wire fence companies

 

  1. Zutoin eta giltza instalatzea.

After all the holes finished , Put the posts into the hole. Pay attention to controlling hammer force when the post approaching the depth in construction. Then pouring of concrete like this, the brace install in the same way, and the brace connect with bolts:

 

security concertina razor wire fence company

 

  1. Soldadura-sarezko panelen instalazioa

Ondoren, hormigoia nahikoa lehortu arte itxaron behar duzu. Ondoren, alanbre-sare soldatutako hesiaren panela zutabearekin batera instala dezakezu. Postan, kakoak egin ditugulako, alanbre-sareko panela instalatzean, lerrokatzean jarri alanbrea kakoan, alanbre-sarearen panela egonkorragoa izan dadin, hemen behar gaituzte kakoak mailuarekin kolpatu.

 

security concertina razor wire fence exporter

 

  1. Tentsio-hariaren instalazioa

Firstly, make one end of the tension wire fixed on the first post with the wire tighterner  . Secondly, interval of 15meters, the other end of the tension wire fixed on the post , with the wire tighterner, the wire was straightened. and the wire mesh panel was more stable.

 

security concertina razor wire fence exporters

security concertina razor wire fence factories

Partekatu

Gure produktuak interesatzen bazaizkizu, zure informazioa hemen uztea aukera dezakezu, eta laster jarriko gara zurekin harremanetan.


euBasque