If you spend time on job sites or farm roads around Anping, you hear it constantly: Panells i rotlles de malla de filferro soldat keep projects moving. From the production lines north of Huangcheng Village in Anping, Hebei, to coastal warehouses, this category has quietly become the backbone for fencing, cages, formwork, and even gabion skins. And yes, I’ve seen more than a few crews switch after a single trial lot—usually for the weld consistency.

Demand has shifted toward hot-dip galvanized and PVC-coated meshes for longer service life, especially where maintenance budgets are tight. Contractors tell me they prefer pre-fabricated panels for speed, but still keep rolls on hand for long runs and terrain that isn’t exactly forgiving. Honestly, it’s a practicality story: fewer posts, fewer cuts, fewer headaches.

Service life (inland, real-world use may vary): electro-galv ≈ 2–5 yrs; hot-dip ≈ 10–25 yrs; PVC-coated ≈ 8–20 yrs; painted ≈ 3–7 yrs. Coastal or chemical exposure will shorten that—no surprises there.

| Material | Q195 / Q235 |
| Diàmetre del filferro | ≈ 1.0–6.0 mm |
| Mesh opening | 12.7×12.7 mm to 100×100 mm (others on request) |
| Mida del panell | ≈ 0.9×2.4 m to 2.4×3.0 m |
| Roll size | Height 0.9/1.2/1.5/1.8 m; length 25–30 m |
| Coatings | Electro-Galv (8–15 µm), HDG (≈40–85 µm), PVC, Paint |
| Typical tests | Salt spray 96–480 h; adhesion 4B–5B; weld shear ≥ 600 N (sample) |

Feedback? Many customers say install time drops by a third when switching to panels. It seems that PVC-coated mesh survives coastal drizzle better than paint—unsurprising but worth noting. And yes, Panells i rotlles de malla de filferro soldat ship well nested; that matters when freight costs bite.
| Vendor | Coating options | Lead time | Customization | Certs | Notes |
|---|---|---|---|---|---|
| XZ Metal (Anping) | Electro, HDG, PVC, Paint | 7–15 days | Aperture, wire Ø, panel size | ISO 9001 | Origin: 200 m N of Huangcheng Village, Hebei |
| Vendor A (Domestic) | Electro, HDG | 10–20 days | Limited | Factory QA only | Budget-focused |
| Vendor B (Import) | HDG, PVC | 25–40 days | Abertura | ISO 9001 | Good for bulk only |


Final note: if you need odd apertures or mixed panels-and-rolls in one shipment, Panells i rotlles de malla de filferro soldat from a plant that runs both coating lines and welding under one roof is, in my experience, the sanity-saving option.