Dig the holes on the ground for the post at every 2m, or 2.5m, or 3m, or 5m , the common hole size is 300mm-500mm . depth is 500mm-1000mm. alignment keep them in the line. Every 5-20m , on the left and right of the post, dig two holes for two braces. the hole size same as the post hole size.
After all the holes finished , Put the posts into the hole. Pay attention to controlling hammer force when the post approaching the depth in construction. Then pouring of concrete like this, the brace install in the same way, and the brace connect with bolts:
Tom qab ntawd koj yuav tsum tau tos kom txog thaum lub pob zeb qhuav txaus. Tom qab ntawd koj tuaj yeem nruab lub welded hlau mesh laj kab vaj huam sib luag ua ke nrog tus ncej. Vim hais tias ntawm cov ncej, peb tau ua cov hooks, thaum nruab cov hlau mesh vaj huam sib luag, kev sib raug zoo muab cov hlau rau ntawm tus nuv, kom cov hlau mesh vaj huam sib luag ruaj khov dua, ntawm no xav tau peb ntaus cov hooks tiaj tus rauj.
Firstly, make one end of the tension wire fixed on the first post with the wire tighterner . Secondly, interval of 15meters, the other end of the tension wire fixed on the post , with the wire tighterner, the wire was straightened. and the wire mesh panel was more stable.