Dig the holes on the ground for the post at every 2m, or 2.5m, or 3m, or 5m , the common hole size is 300mm-500mm . depth is 500mm-1000mm. alignment keep them in the line. Every 5-20m , on the left and right of the post, dig two holes for two braces. the hole size same as the post hole size.
After all the holes finished , Put the posts into the hole. Pay attention to controlling hammer force when the post approaching the depth in construction. Then pouring of concrete like this, the brace install in the same way, and the brace connect with bolts:
Mgbe ahụ, ị ga-echere ruo mgbe kọnkịrị akpọnwụ nke ọma. Mgbe ahụ ị nwere ike iwunye welded waya ntupu nsu panel ọnụ na post. N'ihi na na post, anyị mere nko, mgbe wụnye waya ntupu panel, alignment tinye waya na nko, ka waya ntupu panel bụ ihe kwụsie ike, ebe a chọrọ ka anyị see nko ewepụghị na hama.
Firstly, make one end of the tension wire fixed on the first post with the wire tighterner . Secondly, interval of 15meters, the other end of the tension wire fixed on the post , with the wire tighterner, the wire was straightened. and the wire mesh panel was more stable.